Before Demolition
Henry P., the Recording Secretary of the PNA Lodge #2093 in New Britain, CT contacted us because the existing front entry began separating from the main building. He needed a reliable contractor to demolish the existing structure and rebuild a new front entry ASAP so that the lodge can re-open for its members.
A Closer Look at the Separation Gap
The original footer supporting the front entries weight gave in, allowing the front entry to slowly creep forward and become unattached from the main building.
Our Excavator Crumbled the Existing Entry
When you use the right tools, things always go quicker.
New Concrete Footer
This new footer will easily support the weight of the front entry that we planned for the PNA lodge.
Our Masons Worked Quickly
Working with tight schedules is nothing new to Simply Additions; we know how to make people happy!
PNA Lodge Resumed Full Service! 
Our clients were really happy that they could resume full service of their lodge in only 1 month; after the town re-inspected the front entry.
Ahh, another great addition to our satisfied customer list! Project Cost: $26,544.00Duration only 1 month!72 rebuilt square feet!
Customer TestimonialHenry P. (Recording Secretary of PNA Lodge) New Britain, CT "Dear Darius, Just a little note to thank you for the great job you and your company did in demolishing and rebuliding our lodge front entrance. We have recieved a number of favorable comments from our members and visitors about the quality of work and the overall look you were able to create for us. Knowing you would be on site everyday to oversee the work being done gave us a lot of comfort. The workmanship of your subcontractors was superior. Not only were you able to complete the job on time it was done on budget. We appreciate you bringing to our attention the defect when the building was originally built. Replacing the steel beam now was a lot better than having to try to correct the issue at a later time. You saved us a lot of future grief and aggrevation. Thanks again for the great job." 72 square foot Lodge Front Entry Addition: Demolition and brick and block construction of the front entry for the PNA Lodge #2093. |
|
|